Installation matters for pneumatic conveying system
Inpneumatic conveyingThere is another important link in the process, which is the installation of pneumatic conveying. If the installation is not good enough, even the best equipment cannot achieve the best state. Therefore, the installation of the conveying system is particularly important. Therefore, Shandong Juheng Environmental Protection Equipment Co., LtdThe company has listed several precautions for the installation of pneumatic conveying systems:
The installation of pneumatic conveying systems can be roughly divided into three parts: 1. Installing equipment, 2. Installing pipelines, and 3. Installing dust removal
The precautions for these three parts are roughly the same, and the following must be followed during installation:
After unpacking the equipment, store the relevant materials and hand it over to the buyer for safekeeping after installation.
2. All equipment, valves, and pipeline devices must be installed with drawings for construction. If adjustments are required, the design unit should be consulted first. After the experts of the design unit have demonstrated feasibility, adjustments should be made according to the expert's design and suggestions.
3. The pipelines in pneumatic conveying must be sealed properly. The interior of the pipeline should be smooth to avoid blockage.
4. In addition to the requirements indicated on the drawings, other pipeline process installation designs shall be executed.

5. Except for equipment and valves with clear installation locations, other non compliant individuals should respect the following principles:
(1) The concealed turning position of commonly used valves is about 1.2 meters, and the position should be convenient for installation personnel to operate.
(2) The installation of valves should be as close as possible to the main pipe or equipment.
(3) Valves on pipelines should be arranged in parallel.
(4) When installing valves, try not to subject them to external loads to avoid damaging them due to excessive force
(5) On the premise of not affecting personnel operation, maintenance, and access, the layout of equipment and valves should be as beautiful as possible, leaving a good impression on personnel who work here all year round.
6. All welds in the pneumatic conveying system pipeline: the steel pipe butt welds are U-shaped; The connection between the steel pipe and the flange is a fillet weld; The height of the weld seam is equal to the wall thickness of the steel pipe.
7. For places that require high-altitude operations, such as the installation of ash removal pipes, ash silos, etc., the operating platform should be equipped with corresponding safety measures such as guardrails and ladders, and the staff must undergo safety training.
During the installation process, if there are any changes to the original design, the consent of the design unit should be obtained and a record of the changes should be kept.
Shandong Juheng Environmental Protection Equipment Co., LtdWe have rich experience in pneumatic conveying design, fan selection, pipeline design, rotary feeder selection, and bin pump selection. We can provide unique designs based on on-site and material conveying requirements to achieve customer satisfactionDelivery purpose.